In the ninth of a series of real asset investment case studies, Matteo Quatraro, Director and Head of Portfolio at Gravis Capital Management, looks at a portfolio of hydro assets.
Hydroelectric power is produced by turning the energy of falling or flowing water into electrical power, typically by means of a turbine. Hydroelectric energy facilities fall into three main categories: (i) impoundment facilities where a dam is used to control the flow of stored water, (ii) diversion facilities which use a series of channels to direct flowing water to a turbine, and (iii) pumped-storage which stores energy by pumping water uphill for release at a later time, typically during periods of high electricity demand / price. The power produced depends on the volume of water passing through the turbines and the height differential between the inflow and outflows. This height is called the ‘head’ of a scheme.
Hydroelectric power accounted for approximately 14.3 % of the world’s total electricity generation and 45% of renewable electricity in 2024, making it the largest individual source of renewable generation.
China is the largest hydroelectric producer globally, while in the UK, it makes up approximately 1.7% of the renewable energy mix.
The UK's renewable energy mix:
The UK’s largest concentration of hydro assets (~80-90% of the total UK hydro capacity) is in Scotland. Many of these hydro plants are reservoir-based (storage) or run-of-river, with the Highland mountains and lochs providing natural sites for large and medium-scale hydro schemes.
Hydro generation increased by 6.1 per cent in 2024 to 5.8 TWh. There was a small increase in average rainfall and new capacity (up 2.1 per cent on 2023).
The investment case
In 2019, Gravis, as investment adviser to GCP Infrastructure Investments Limited (“GCP”), recommended an investment in 14 run-of-river hydro projects with operations located in Scotland for a total capacity of 20.9MW. The portfolio includes 16 turbines supplied by Gilbert Gilkes and Gordon, the UK leading hydroelectric turbine manufacturer, which are spread across 14 locations in northern Scotland. The investment represented an attractive opportunity to further diversify GCP’s renewable generation exposure, with best-in-class technology. These hydro assets benefit from public subsidy in the form of inflation-linked Feed in Tariffs (“FiT”).
How revenue is derived
Under the FiT scheme, generators of electricity from renewable or low carbon sources such as solar or hydro assets (the “FiT Generators”) are entitled to receive Tariff Payments from those licensed electricity suppliers defined as FiT Licensees. The initiative was designed to promote the development of small-scale renewable electricity generation, through incentive mechanisms. Households and businesses are eligible for fixed payment rates for the electricity they produce, making it more financially viable to purchase and install renewable energy generators.
FiT Payments fall into two categories, the Generation Tariff and the Export Tariff. The Generation Tariff is a set rate paid by the FiT Licensee for each unit (or kWh) of electricity generated, the set rate being dependent on the size and type of the installation, as well as the time at which the generator was completed, and fixed for the life of the generator. The Export tariff is paid for the electricity exported to the grid. It is government-set, index-linked, and paid for the length of the FiT term.
On an annual basis, FiT Generators can elect to receive either the FiT generation tariff or sell the electricity into the market and receive the wholesale value of electricity together with any embedded benefits associated with such supply.
How the sector could evolve
There are many small rivers and watercourses where run-of-river schemes could be installed, especially for local community energy projects. However, with limited size opportunities they would not be very attractive to investors.
Instead, Pumped Storage and Hybrid Systems could be the answer for a future growth in the sector. This is a proven technology for grid balancing and energy storage and, thanks to a new Scheme introduced in the UK, there will be the prospect of a cap and floor price mechanism from the Government that would guarantee a long-term and reliable cash flow.
In 2025 the Government introduced a financial support mechanism for Long Duration Energy Storage (LDES) projects (like pumped hydro) to guarantee a minimum return (floor) while capping excessive profits, ensuring investment stability, protecting consumers from high costs, and encouraging new storage for grid balancing. Developers get a safety net (floor) to cover costs if revenue is low, and share surplus revenue (above the cap) with consumers, creating a win-win for investment and affordability in the green energy transition.
Furthermore, these solutions become even more sustainable when using old mining or quarry sites for closed-loop pumped storage, and bring new job opportunities for local communities.
This is a crucial financial tool to de-risk large storage projects, making them attractive investments by providing a revenue "safety net" (floor) while ensuring public benefit through profit sharing (cap), enabling a more secure, cheaper, and greener energy system.
Important Information
This article has been prepared by Gravis Capital Management Limited (the "Investment Adviser“ or “Gravis”) and is for information purposes only. It is not intended for distribution to, or use by, any person or entity in any jurisdiction or country where such distribution or use would be contrary to local law or regulation. Any recipients of this article outside the UK should inform themselves of and observe any applicable legal or regulatory requirements in their jurisdiction and are treated as having represented that they are able to receive this article without contravention of any law or regulation in the jurisdiction in which they reside or conduct business.
This article should not be considered as a recommendation, invitation or inducement that any investor should subscribe for, dispose of or purchase any such securities or enter into any other transaction in the GCP Infrastructure Investments Ltd (the “Company”) or any other fund affiliated with Gravis. The merits and suitability of any investment action in relation to securities should be considered carefully and involve, among other things, an assessment of the legal, tax, accounting, regulatory, financial, credit and other related aspects of such securities.
No undertaking, representation, warranty or other assurance, express or implied, is made or given by or on behalf of the Company, the Investment Adviser or any of their respective directors, officers, partners, employees, agents or advisers or any other person as to the accuracy or completeness of the information or opinions contained in this article and no responsibility or liability is accepted by any of them for any such information or opinions or for any errors, omissions, misstatements, negligence or otherwise for any other communication written or otherwise. In addition, neither the Company or the Investment Adviser undertake any obligation to update or to correct any inaccuracies which may become apparent. The information in this article is subject to updating, completion, revision, further verification and amendment without notice.
Past performance is no guarantee of future performance.
Gravis Capital Management Ltd is authorised and regulated by the Financial Conduct Authority; registered in England and Wales No: 10471852 and its principal place of business is 24 Savile Row, London W1S 2ES.